Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Arditi, D and Gutierrez, A E (1991) Factors Affecting U.S. Contractors' Performance Overseas. Journal of Construction Engineering and Management, 117(01), 27–46.

Beliveau, Y J, Snyder, D A and Vorster, M C (1991) DBE Programs—New Model. Journal of Construction Engineering and Management, 117(01), 176–92.

Echeverry, D, Ibbs, C W and Kim, S (1991) Sequencing Knowledge for Construction Scheduling. Journal of Construction Engineering and Management, 117(01), 118–30.

Eldin, N N (1991) Management of Engineering/Design Phase. Journal of Construction Engineering and Management, 117(01), 163–75.

Glavan, J R and Tucker, R L (1991) Forecasting Design‐Related Problems—Case Study. Journal of Construction Engineering and Management, 117(01), 47–65.

Hinze, J and Antal, T (1991) Construction Contract Provisions for Preservation of Artifacts. Journal of Construction Engineering and Management, 117(01), 106–17.

  • Type: Journal Article
  • Keywords: Contract management; Construction; Archaeology; Preservation; History; Social factors;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1991)117:1(106)
  • Abstract:
    Contract provisions of more than 100 owner agencies are examined to determine the extent to which cultural resources are addressed in construction contracts. Results show that owner agencies are becoming increasingly aware of the need to preserve artifacts of cultural and historical importance as evidenced by the increased use of provisions concerning cultural resources, research reveals that there is a considerable discrepancy between the clarity and completeness of the various provisions. Before any construction activities take place on a site and before construction contracts are awarded, owners should conduct thorough investigations of their properties to determine the likelihood that artifacts of value might be present. In addition, owners should include contract provisions that require construction contractors to suspend work activities when suspected items of value are discovered during construction. To assure compliance with these provisions, it is also important to include provisions that compensate contractors for such suspensions of work activities. Guidelines for other related construction contract provisions are provided.

Laufer, A and Shohet, I M (1991) Span of Control of Construction Foreman: Situational Analysis. Journal of Construction Engineering and Management, 117(01), 90–105.

Morad, A A and Beliveau, Y J (1991) Knowledge‐Based Planning System. Journal of Construction Engineering and Management, 117(01), 1–12.

Nicholls, R (1991) Sandwich‐Barrel Shell Construction by Inflation. Journal of Construction Engineering and Management, 117(01), 131–47.

Thomas, H R, Smith, G R and Wright, E D (1991) Legal Aspects of Oral Change Orders. Journal of Construction Engineering and Management, 117(01), 148–62.

Yeh, Y, Hsu, D and Kuo, Y (1991) Expert System for Diagnosing Damage of Prestressed Concrete Pile. Journal of Construction Engineering and Management, 117(01), 13–26.